SOMA CEA — Material & Construction Formula App

Live data: connecting… · 26 reference sheets

🧱 Concrete Material Calculator

Material requirements per m³ of finished concrete. Assumes 30% shrinkage, 5% wastage. Mechanical mix water/cement = 0.4–0.5.

Inputs
Reference table — all classes
ClassMix typeRatioCement (kg/m³)Bags/m³Sand (m³/m³)Gravel (m³/m³)Water (L/m³)
C-7Mechanical1:4:815030.420.8460
C-15Mechanical1:3:620040.410.8280
C-20Mechanical1:2:42755.50.390.78110
C-25 to C-30Mechanical1:2:33256.50.450.68130
C-7Hand1:3.5:81533.060.380.8792
C-15Hand1:2.5:62024.040.360.868121

🪣 Mortar Calculator

Cement mortar (25% shrinkage, 5% wastage) and compo-mortar (20% shrinkage, 5% wastage) per m³ of finished mortar.

Cement mortar
Compo-mortar
Lightweight screed
Cement mortar reference
RatioCement (kg/m³)Bags/m³Sand (m³/m³)
1:34609.20.99
1:43687.41.05
1:53066.11.09
1:62635.31.13

🏗 Masonry Calculator

Material quantities per m² of wall. Brick masonry uses compo-mortar 1:2:9; hollow blocks use cement mortar 1:4.

Reference — per m²
Wall typeUnits/m²WastageCement (kg/m²)Lime (kg/m²)Sand (m³/m²)
Half-brick 110mm585%540.034
One-brick 230mm1155%12.530.081
HB 10cm block135%500.014
HB 15cm block135%7.500.022
HB 20cm block135%1000.028

🖼 Plastering Calculator

Cement mortar plaster on walls, quantities per 10 m². Wastage: 12mm=20%, 15mm=15%, 20mm=12%, 25mm=10%.

Plastering reference (per 10 m²)
Ratio12mm cement(kg)12mm sand(m³)15mm cement(kg)15mm sand(m³)20mm cement(kg)20mm sand(m³)25mm cement(kg)25mm sand(m³)
1:346.150.1479.10.17102.90.22114.840.25
1:4530.1563.80.1882.430.24920.26
1:544.10.1652.680.1968.60.2576.560.27
1:637.80.1645.150.1958.80.2565.620.28

🎨 Painting Calculator

Standard coverage rates for 2–3 coat systems on prepared surfaces. Confirm against current manufacturer data sheets before pricing.

Coverage reference (L/m² per coat)
SystemPrimer (L/m²)Undercoat (L/m²)Finish (L/m²)Note
Emulsion internal 2c0.100.10
Emulsion internal 3c0.100.100.10
Emulsion external 2c0.24 L/m² total
Emulsion external 3c0.30 L/m² total
Enamel wood 2c0.080.070.5L thinner/gal
Enamel wood 3c0.060.050.040.5L thinner/gal
Enamel steel 3c0.060.050.04
Varnish wood door 3c0.130.120.12+knotting 0.01

🏠 Roofing Material Calculator

CIS (corrugated iron sheet) on wooden truss, up to 15° slope. Sheet coverage ~1.38 m²/sheet.

🔲 Flooring & Tiles Calculator

Material quantities for common floor finishes.

Reference
FinishPrimaryCement (kg/m²)Sand (m³/m²)Notes
Terrazzo tile 20×2026 pcs/m² +20%10.12 + 0.46 grout0.001 grout
Cement screed 2.5cm 1:320% mortar waste13.780.03 m³/m²
Marble 2cm, bedded 1:41.02 m²/m²10.12 bedding0.029Polish 0.03 kg/m²

📏 Rebar Weight Calculator

Steel reinforcement bar weight by diameter. Source: standard 12m bars, plain vs deformed.

Standard 12m bar weights
Ø (mm)Plain (kg/12m)Deformed (kg/12m)Plain (kg/m)Deformed (kg/m)
62.6642.8080.2220.234
84.7404.9920.3950.416
107.4047.7760.6170.648
1210.65611.1840.8880.932
1414.52015.2401.2101.270
1618.96019.9201.5801.660
1826.76028.0002.2302.333
2029.76031.1872.4802.599
2235.76037.5602.9803.130
2546.20048.6003.8504.050
2857.96071.760 ⚠4.8305.980 ⚠
3075.72079.5606.3106.630
⚠ Ø28 deformed value (71.760) may be an OCR/typo of ~63.7 — flagged, not corrected.

🔩 Steel Plate Weight Calculator

Mild steel plate weight by thickness. Select thickness and enter area to get total weight.

Full plate weight table
Thickness (mm)kg/m²
323.55
431.40
539.25
647.10
862.80
1078.50
1294.20
14109.90
16125.60
18141.30
20157.00
22172.70
25196.20
28219.80
32251.20
36282.60
40314.00
45353.20
50392.50
56439.60
63496.50
70549.50

📐 Angle Section Reference

Equal and unequal angle sections — weight per meter. Use the search to filter quickly.

Equal angles
Unequal angles
Weight
kg
Tonnes
t

🔧 Tube Section Reference

Rectangular and circular tube sections — weight per meter.

Rectangular tubes
Circular tubes
Weight
kg
Tonnes
t

⚗️ Mix Ratio Reference

General formula: Qty = UnitWeight × Fraction × ShrinkageFactor × WastageFactor × Volume (m³).

Cement mortar per m³
RatioCement (kg/m³)Sand (m³/m³)ShrinkageWastage
1:34600.9925%5%
1:43681.0525%5%
1:53061.0925%5%
1:62631.1325%5%
Compo-mortar per m³
RatioCement (kg/m³)Lime (kg/m³)Sand (m³/m³)
1:1:62213000.95
1:2:91473990.95
1/2:1:31955280.89
Concrete per m³ (primary table)
ClassTypeRatioCement (kg)Sand (m³)Gravel (m³)Water (L)
C-7Mech1:4:81500.420.8460
C-15Mech1:3:62000.410.8280
C-20Mech1:2:42750.390.78110
C-25–C30Mech1:2:33250.450.68130

📌 Nails & Standard Door Sizes

Reference data for nails (pieces per kg) and standard door dimensions.

Nail reference (pcs/kg)
SizePcs/kg
1 cm950
2.5 cm (1")~500
4.5 cm (1¾")~200
5 cm (2")~150
6.5 cm (2½")~80
7.5 cm (3")~50
10 cm (4")~25
Standard door sizes
TypeWidth (m)Height (m)Notes
Internal single0.80 / 0.902.10Standard internal
Main entrance single0.90 / 1.002.10
Double door1.60 / 1.80 / 2.002.10Per leaf: ½ width
French window (double)1.20 / 1.402.10Glazed

✅ MEP Installation Checklist

Electrical and sanitary installation categories. Check off items as they are verified on site.

Electrical
Sanitary
Electrical installation — category checklist

📋 BOQ Builder

Add calculated items from any calculator to build a project Bill of Quantities summary.

Add line item
Bill of Quantities
#DescriptionQtyUnitUnit cost (ETB)Total (ETB)
TOTAL ESTIMATED COST ETB 0.00